Citroil – East Coast Room Upgrade

CITROIL – East Coast Room Upgrade

CITROIL – East Coast Room Upgrade

Industrial Structure with Tank Supports, Platforms, and Railings

Project Overview

  • 📍 Location: 444 Washington Avenue, Carlstadt, NJ 07072
  • 🏗️ Type: Industrial Structure
  • ⚖️ Tonnage: 24 Tonne
  • ⏳ Duration: 2.5 Weeks

Project Description

The project encompasses a range of industrial construction elements including platform steels, stairs, and railings, along with tank support steels. These structural components ensure functionality, accessibility, and durability of the facility.

Challenges

A significant challenge in this project was coordinating the tank supports with the varying field conditions. Ensuring proper alignment and integration of the tank supports with the existing site conditions required careful planning and adaptability in execution.

Our Approach

  • Conducted thorough site inspections before installation
  • Implemented flexible design adjustments for tank supports
  • Coordinated closely with site engineers for precise alignment
  • Maintained strict safety and quality standards throughout

Project Highlights

  • 24 Tonne industrial steel structure
  • Integration of platforms, stairs, and safety railings
  • Custom-designed tank support system
  • Efficient delivery within 2.5 weeks

Outcome

The CITROIL – East Coast Room Upgrade project was successfully executed, overcoming field challenges to deliver a robust industrial structure. The tank supports, platforms, and railings were seamlessly integrated, ensuring stability, safety, and compliance with the client’s operational needs.

Visual Gallery

Need a reliable partner for industrial construction?

We deliver precise, durable, and efficient structures tailored to your needs. Let’s build your next project together.

Contact Us

Leave A Comment

Your email address will not be published. Required fields are marked *